in

GeoSciences

Department of Geography, Geology and Planning

This Gallery

29 total photos
Last updated on 10-02-2007

Statistics

  • Posted By: admin
  • Viewed: 607
  • Comments: 0
  • Ratings: 0
  • Rating

Popular Tags

No tags have been created or used yet.

Page 6 of 29 (29 items) « First ... < Previous 4 5 6 7 8 Next > ... Last »
 
Filtration tanks are backflushed every 60 hours with clean water to extract the filtrate. The process take about 45 minutes, and the water used is either cycled back through the processing plant or piped to a holding facility in a nearby quarry.
View Sizes View Details
  • Aperture Value: F2.9
  • Date/Time Original: 10/13/2004 2:57:56 PM
  • Exposure Time: 6218/100000 sec
  • Flash: Flash did not fire, auto
  • Focal Length: 7.6 mm
  • Model: HP PhotoSmart C945 (V01.46)
More
Filtration tanks are backflushed every 60 hours with clean water to extract the filtrate. The process take about 45 minutes, and the water used is either cycled back through the processing plant or piped to a holding facility in a nearby quarry.

Comments

No Comments

Add Comment

(required)  
(optional)
(required)  
Add
Powered by Community Server (Non-Commercial Edition), by Telligent Systems
  • Maintained by: Geosciences
  • • Last Modified:
  • • URL: